At Davison Fencing, it starts with a conversation. We offer no-obligation advice to help you realise your project. Please leave your details below and we can schedule a meeting to discuss your needs.

Contact Davison Fencing by calling us on 01274 727274, email us on mail@davisonfencing.co.uk or just fill in this form.

Your Name

Davison Fencing Ltd is committed to respecting your privacy. The information you provide will only be used to respond to your query. It will not be stored in an online database and will be retained only for as long as necessary to address your request.

Glencar kingsway park

Kingsway Business Park

commercial

Davison Fencing supplied and installed perimeter fencing, gates, timber enclosures and safety systems for Glencar Construction’s new warehouse units at Kingsway Business Park. The works supported the development’s high standards, with efficient delivery, strong health and safety performance, and positive client feedback, demonstrating Davison’s capability in large-scale industrial projects.

Date2025
ClientGlencar
Budget£140,000
LocationRochdale, Greater Manchester
Systems Used

Industrial Warehouse Development

Supply and installation of permanent fencing, gates, and safety systems for Glencar Construction’s new industrial warehouse development at Kingsway Business Park, Rochdale.

About the Project

Davison Fencing were appointed by Glencar Construction to supply and install a range of permanent fencing and access control systems for the new industrial warehouse development at Kingsway Business Park, Rochdale.

The scheme delivers two Grade A industrial warehouse units measuring approximately 87,000 sq ft and 116,500 sq ft, constructed to BREAM “Very Good” and EPC A standards. Developed by Wilson Bowden Developments and Cabot Properties, the project forms part of the continued expansion of Kingsway Business Park, one of the North West’s leading logistics and industrial hubs.

Our Work Included:

Perimeter Fencing & Gates

  • Installation of V-mesh security fencing (2.4m high) finished in PPC green RAL 6005, providing robust perimeter protection around both warehouse plots.
  • Supply and installation of 6-5-6 mesh pedestrian gates and 8-6-8 mesh double- leaf vehicle gates, all galvanised and powder-coated to match the fencing system.
  • Provision of manual cantilever sliding gates to the main service yard entrances, including ground tracks and security hardware supplied by Locinox. 

Timber Works

  • Construction of timber palisade refuse stores and timber hit-and-miss screening enclosures around condenser compounds.
  • Fabrication of steel-framed, timber-infill gates and Z-frame access gates using Tanalith E-treated softwood for durability and aesthetic integration with surrounding finishes.

Safety & Site Protection

  • Installation of Armco safety barriers and handrail extensions to service yards.
  • Supply and fitting of steel bollards, lamp post protection kits, and galvanized key-clamp handrails to pedestrian and loading areas.

Project Outcome

Davison Fencing successfully delivered a comprehensive external works package that complemented Glencar’s high quality build and sustainability objectives.

Our team’s careful sequencing and collaborative approach ensured the fencing, gates, and safety systems were installed efficiently, safely, and to specification – providing secure, durable, and visually consistent boundaries across both warehouse units.

This project demonstrates Davison Fencing’s capability to support large-scale industrial developmentd with bespoke and high-performance perimeter solutions.

Client Feedback

Keir

“First and foremost the feedback from the wider team regarding Davisons delivery of the fencing package has been great. The lads have taken very little actual ‘managing’ from us and have, once they’ve been given a few set out points, largely kept themselves busy and have progressed to programme as the site has required. Health and safety standards have been adhered to and in particular the processes relating to breaking ground safely.

From an off-site support perspective, the team have always been proactive in their approach and have produced detailed drawings as and when needed and have provided the delivery team with the tools (information/materials/ancillaries) to get the job done.

The team have self-snagged as they go, which is refreshing! And remedied any issues in-house without fuss.

Overall, very positive and would recommend in the future.”

Senior Construction Manager, Glencar Construction Limited